Wenzhou Hangcheng Electric Co., Ltd.
Main products:terminal blocks,din-rails,plastic terminal box,busbar,brass terminal blocks
Products
Contact Us
  • Contact Person : Ms. xiao kaimei
  • Company Name : Wenzhou Hangcheng Electric Co., Ltd.
  • Tel : 86-577-13780105899
  • Fax : 86-577-61712568
  • Address : Zhejiang,Yueqing,Liuzhai Village,Liushi Town,Yueqing City,Zhejiang Province
  • Country/Region : China
  • Zip : 325603

Din rails transformer brass terminal bars/HC-012

Din rails transformer brass terminal bars/HC-012
Product Detailed
Prompt Delivery Small Order Accept High Quality & design CE And ROHS Ceritificate OEM service

Description &Technical data:

PA ,Polyamide 66,94-2 grade .Inflaming retarding,Working termpertaure:-30°C to 110°C.

PE,Polypropylene,Inflaming retarding,low transparency,low rigidity,goog bounce impact force,Working     termpertaure:-30°C to 100°C.

ABS, good resist dissolve ,good bounce impact fore,Working termpertaure:-20°C to 100°C.

Brass.Scews is iron plated zinc.

Voltage:250 to 450V

Color: according to sample pictures or customized.

OEM Service Offered,Buyer Label Offered , we can offer samples or the drawings to   process production according to the customer, supply different size,such as ,different  length ,width,hole diameter.Please send your drawings,requirements or specifications.

Specifications Drawings:

Item NO.Spec.LL1l2HWΦScrew SizePlastic Setting
W×Hmm
HC-012-7P6×951553532145.3M5×8PA
HC-012-10P6×972763532145.3M5×8PA
HC-012-12P6×985893532145.3M5×8PA
HC-012-15P6×9104.5108.53532145.3M5×8PA

All products that we supplied  have  the feature of safety, reliable, convenient and cheaper in price. Good in power conductor, lower in contact resistance, full range of specification. Customer  satisfaction is our greatest pursuit ! We sincerely welcome new and old customers Contact us by letters or calls to discuss cooperation and make a common development!

Minimum order: 1000 USD (by sea or by air) ,and mixed order is available,

                                     Unlimited by Express  (DHL,UPS,TNT...)

Payment :                  a.100% TT  in advance .(Order less than 4000 USD)

                                     b.30%   TT in  advance,70% TT before delivery

                                     c.70%   TT in advance,the balance against the copy of B/L at sight

                                     d. Negotiable

Delivery time:  3-30  days  after received receipt of deposit.

Din rails transformer brass terminal bars/HC-012



Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.